What to Put in a Philippine Home Construction Contract — Scope, Payments and Delay Penalties (New Build in Angeles)
Jeff, a retiree building a house in Angeles, walks through his construction site and then shares what he thinks matters most in a Philippine home building contract, based on his own experience. He stresses he is not a contract expert and this is just his view.
💡 Key takeaways
[What to put in the contract]
• Scope of work: spell out exactly what's covered. He left tiles, all cabinets in the house, countertops and light fixtures out of his contract and chose them himself. If the builder supplies them you usually only pick from two or three options and get builder-grade quality, he says.
• He is working with a separate cabinet maker and put 50% down.
• Change orders: you will change things while building, so cover them in the contract. Review the architectural drawings carefully to keep changes to a minimum.
• Milestones and progress reports: include key construction stages and reports.
[Payments]
• He believes most contractors want about 50% of the total upfront.
• In his contract, later payments follow the progress report — another 10% at 60% completion, another 10% at 70%.
• If doing it again, he might tie payments to milestones.
[Delay penalty]
• His contract says that if the contractor doesn't finish by the end of April, the contractor pays 1% of the remaining amount per day (as he recalls it).
• A penalty that's too harsh can scare a contractor away or push the price up for the extra risk, so aim for something reasonable that still encourages finishing on time.
• The contractor is motivated by the penalty, but site workers (subs) may not be, since they'll be out of work when the project ends.
• He is paying rent and must give his landlord two months' notice, so the finish date matters to him.
[Site supervision]
• If you won't be in the Philippines during the build, put supervision arrangements in the contract.
• He says he wouldn't build without being there unless he had someone on site he could really trust — corners tend to get cut when nobody is watching, and it's hard to undo once finished.
• He suggests looking at other contracts and asking expats who have built about key points and problems.
[How floor area is counted]
• In the Philippines all covered space counts toward floor area, he says. His house is about 330 sqm (about 3,500–3,600 sq ft), including the garage and the roofed outdoor living area.
• The living, dining and kitchen area is roughly 10 m × 5 m, about 50 sqm.
• The lot is just under 400 sqm; most lots in his subdivision are 500 sqm or more, up to about 800 sqm, so his is on the small side there.
[Site notes]
• Ceilings use a 'cove' design with hidden lighting along the edges, finished in drywall.
• The cassette AC needs about 45 cm of clearance between the ceiling frame and the steel decking, so the framing is being lowered.
• Floor outlet conduits are covered with dry packing to level the floor, then tiled.
• The Philippines uses LPG rather than propane; instead of a concrete tank box, he'll put two large tanks on an outdoor concrete pad.
• Water is stored in a cistern and pumped under pressure to the house; the cistern will be waterproofed and tiled. The septic tank is dug about 2 m deep and planned with three chambers.
⏱ Chapters
00:00 Site intro
01:05 Plastering and ceiling work
03:20 Electrical and roof progress
05:27 Cistern and structural work
08:02 Ceiling framing and plumbing
11:03 House and lot size
13:54 Building contract points
💬 What viewers said (17 comments)
• Fellow builders advised checking that proper waterproofing sealer is used and that toilets are set with wax seals rather than stuck to the cement.
• Many thanked him for covering the 'business' side of building, like the contract.
• One Filipino viewer objected to putting a cassette AC in a cove-light ceiling; Jeff replied it's off to the side, not in the cove.
What are you using for waterproofing?
Greg here from Angeles City. I'm in the middle of my contract for a build in Porac — be specific on everything. Mine is much like yours, but plumbing fixtures (sinks, toilets, showers, towel hardware) are my choice. And make sure proper wax seals are used for toilets — they like to stick toilets to the cement instead of using proper flanges. Good luck on April 😅
Great walkthrough of your home build. Thanks for discussing the 'business' side of building and the smart tweaks to your contract. 👍🏻