Angeles retirement home almost done — power hookup fee, cleaning cost, appliance delivery, fire safety requirements
In one line
Jeff, an American who has spent 15 months building a retirement home in Angeles, covers the final steps before moving in: professional cleaning, switching to residential power, appliance delivery and installation, internet cable problems, and fire department requirements.
💡 Key takeaways
[Switching to residential power — Angeles Electric]
• Moving from temporary construction power to residential power takes several site surveys by Angeles Electric. The second survey took about 10 minutes, and the report takes a few days.
• Once the report is done, you pay a hookup fee of about 12,500 pesos at the office, and he was told it could take 1–3 weeks because of a large backlog.
• The line was dropped from the pole to the panel box, but the meter is installed by a separate crew at another time.
• He had set up some outlets for 110V, but the supervisor said they no longer run neutral lines because of electricity theft. The neutral issue has to be taken up with the company's engineer.
• The AC vendor won't test or turn on the aircons until the house is on residential power, so he is holding off on moving in.
[Professional cleaning]
• OC Cleaning Services cleaned the house in a day, including inside and outside of the windows, bringing scaffolding and ladders for the high windows.
• According to his reply in the comments, it cost 15,000 pesos (scaffolding and ladders extra); another company was still 40,000 pesos after negotiating.
[Appliance delivery and installation]
• Delivered: two refrigerators (one for inside, a smaller one for the outdoor bar), a big-screen TV, a range, and a dishwasher.
• The delivery crew would not take the boxes — he was told you must keep them for one week in case of a return.
• He was told to wait 8 hours before turning on the Samsung fridge because of the freon. He explains fridges with water/ice dispensers are uncommon in the Philippines since many places lack potable water.
• He paid a 1,000-peso installation fee for the dishwasher at SM Appliances, which was required for the one-year warranty. But the installer would not do plumbing such as the drain fitting, so a separate plumber was needed.
[Internet and hunting for parts]
• The Cat6 cable from the modem to his office was damaged (a loose or broken wire), which caused trouble.
• He searched for a connector to join two Cat6 cables and a gas fitting for the LPG range, but every store was out of stock. He says things readily available in the US are often hard to find or out of stock in the Philippines.
• Parking in town is tough, so a scooter is better for these errands.
[Occupancy permit — fire requirements]
• For the fire department portion of the occupancy permit he needed two fire extinguishers, two plug-in battery-operated emergency lights, and two smoke detectors.
• You submit a photo of the receipt to the fire department, which then signs off.
• People he talked to say the process has slowed down since the fire department moved it online.
[Moving progress]
• He shipped his belongings in 33 balikbayan boxes, and the move is about 85% done. The washing machine and heavier items will be moved with his builder's truck and crew.
⏱ Chapters
00:07 Introduction
01:15 Professional cleaning, power survey, the neutral line problem
06:24 Move-in progress, hookup fee, waiting time
09:29 Appliance delivery and the box-keeping rule
13:34 Dishwasher installation fee and what it covers
14:35 Power line connection and the 110V neutral
16:38 LAN connector and LPG fitting out of stock
17:39 Fire safety requirements and the occupancy permit
💬 What viewers said (69 comments)
• Many congratulated him on the nearly finished house.
• Asked about the cleaning cost, he replied 15,000 pesos; viewers building their own homes asked which AC and cabinet companies he used.
• A long technical debate followed on the 110V neutral issue, with alternatives such as a transformer or a separate ground rod, and on how Philippine power service is wired.
• One tip: LAN connectors are cheap on Shopee or Lazada.
Your outdoor living area looks very nice. If the refrigerator was laid down, you're supposed to wait 24 hours before turning it on. What if you bought a neutral wire and supplied it to the electric company to install? Did you ship the balikbayan boxes all at once?
How much did the professional cleaning cost, if you don't mind sharing? Just to get an idea.

Comments 0
Please log into write a comment.